Union Station Remodel

Pret-A-Manger-Photo-Collage

Pret A Manger Major Remodel Union Station Washington, DC

This was a major Pret A Manger remodel project in Union Station.  There were many logistical items involving Amtrak and Union Station officials.  Schedule was a one week shutdown with full 25 ft. height drywall barricades on a busy corner location.  Access to staging area, deliveries and demo removal was very limited and had to be closely coordinated with Union Station.

  • On site pre construction drawing review, existing conditions survey, logistics planning, landlord coordination and scheduling meeting.
  • Structural design review and recommendations for improvements provided.
  • A 13 FT drywall soffit drop was suspended off of existing roof joists.  All was supported off of steel angle from 25 FT above the floor.
  • A dropped drywall ceiling box "cloud"  was supported at 11 FT above the floor from steel angle at 25 FT above the floor on all-thread rods.
  • Project included new tile and wood flooring.
  • Wood planking, subway tile and thin brick was installed on all walls.
  • Lighting was supported in cable trays hung from 25 FT above.
  • Kitchen work, back food prep line demo and construction, and front service line work was included.
  • HVAC and plumbing was completed through an 18" thick floor slab.
  • All new furniture and equipment package was installed.  Included stainless steel work.

No Comments Yet.

Leave a comment